Standards & Procedures |
Quality Assurance Statement |
We at P S Applications Ltd have always
strived to achieve the best quality of work for our clients.
To this end we have put in place certain procedures to ensure
that when a contract is completed our client can have every
confidence that it is done correctly and will perform its
function in a fire emergency. |
Our Procedures |
- When we first visit a
site we carry out a survey which lists all the relevant
information from our client’s representative right
down to which toilets we can use. This is to ensure the
smooth running of a contract with everyone knowing what
they are doing and their various responsibilities.
- When arriving on site
all operatives report to the site manager for H&S induction.
- We always insist on being
provided with A3 drawings from site. These are used to indicated
what work is undertaken and where. A copy of these drawings
are included in the operation and maintenance manuals.
- All fire stops are labelled
with our company name and contact No, name of installer,
name of checker and date. These labels are not applied until
the fire stops are complete and have been checked.
- Intumescent paint is applied
in accordance with the manufacturer’s instructions.
Our operatives have humidity and temperature gauges to ensure
conditions are right for application.
- Wet film thickness checks
are carried out during application of intumescent paint
and dry film checks upon completion. Our operatives have
electronic dry film thickness meters.
- Upon completion of all
work a certificate of conformity is issued to our client
stating materials employed and what has been achieved. Certificate
of Conformity.
|
The above is the core of our procedures
and can be tailored to certain contracts which have more specific
requirements relating to quality.
|
|